Calais Sheer Flow Stainless Steel Waterfall Weir

Calais Sheer Flow Stainless Steel Waterfall Weir | SheerFalls

Calais Sheer Flow Stainless Steel Waterfall Weir

Write a Review

Starts at: $240.62

Brand: Stowasis

SKU: SEG62211

Need accessories for this item?

View Accessories

Product Accessories

Part #: CCLS12

$103.54

Part #: PlmbAssblOwen

$28.99

Part #: pmbgassbly3Sheer

$96.99

Part #: plmbgasmbly1sheerfal

$109.99

The Stowasis Sheer Flow Waterfall is a high quality stainless steel that can be used indoors or out and installed in many different locations such as gardens, restaurants, bars, malls, professional buildings and entrances.

These curved weirs offer a formal design for diverse applications.

Unique effect with quieter water entry.

Easily add LED light strips facing forward for a stunning look.

The weir should not be placed much higher then 3' from basin or the sheet of water can break up.

The smaller the weir and the less flow the lower you should place the Sheer Waterfall Weir.

Available in the following:

Part Number

Width

Weir Depth

Recommended Flow(GPH)

# Inlets

SEG62211

11.81" 13" 1000 One - 1"FPT

SEG62212

23.62"13" 1500 One - 1"FPT

SEG62213

35.43"13" 2200 Two 1" FPT

SEG62214

47.24"13" 3000 Three 1" FPT

SEG62215

59.06"13" 3750 Three 1" FPT


F.A.Q

Note: Not to be used in chlorinated water or swimming pools. Only the Acryllic Sheer Falls can be used in Chlorinated water.

Available in the following: 

 

Part Number

Width 

Weir Depth 

Recommended Flow(GPH) 

# Inlets 

SEG62211 

11.81" 

13" 

1000 

 One - 1"FPT

SEG62212 

 23.62"

13"  

1500 

 One - 1"FPT

SEG62213  

 35.43"

13"  

2200 

Two 1" FPT

SEG62214 

 47.24"

13"  

3000 

Three 1" FPT

SEG62215 

 59.06"

13"  

3750 

 Three 1" FPT

F.A.Q.

Question: How do I install the top plate on top of the falls if I want to use Cinder blocks above the falls?

Answer: You had a question regarding the installation of our 36 stainless steel sheer falls (SEG2035D) with the top plate (TCP35).  Please note that NONE of the Calais units are load bearing nor intended to be in a load bearing situation.  The installation processes are numerous & only limited by the creativity of the installer itself.  One common method of installation is by notching into the wall material (stone or concrete blocks) to accommodate a load bearing lintel (steel grade L brackets) so that the units can still reside free from any weight.

Although the diagram below is for the acrylic sheer falls, this applies to all of the weirs in our Calais collection. 

Question: On SEG62211 does the LED light strips shine in the viewers eyes? 

Answer: The LED lights do point to the front of the falls. 


Question: How to prevent that? 

Answer: The light bar on this model of falls set way back in the falls and water is flowing by the bar. The light is not extremely bright. The water takes some brightness away from the light.

 

Question: Where does light cord go?

Answer: The cord has to be taken from the back of the falls and snaked around the side of falls, then over the top at the rear of the falls.



Customer Question: What is the maximum height it can be installed without the pattern breaking up?

Supplier's Answer: The rule of thumb is that water should fall in a sheet approximately the width of falls. 24" falls 24", 36" fall 36" and so forth.

Question: What is the correct way to install the lights into the stainless steel waterfall?

Answer: The light bar should fit into the two slots on either side of the inside of the stainless steel Sheer Falls. These slots should have a small ss tab that is folded or bent to hold light bar in the place. Usually, the LED lights are facing the front of the Sheer Falls.


Question: How long is the cord on light strips ? 

Answer: 30'.

 

All units extend out approximately 13".

Rear View

This shows how light bar is mounted on both Sheer Flow and Sheer Cascade. It fits back under the stainless steel top plate

Helpful Construction Hint from the Supplier:

The Sheer Falls would be mounted above water level, so most likely well above the Firestone liner. Most Sheer Falls are installed when wall is being constructed. If the above ground pond is 24" deep, then Sheer Falls would be approx18" to 36" above the water level, depending how wide the Sheer Falls the customer installs. The more narrow the falls, the shorter distance water will fall in the perfect sheet that most desire. The customer would need to have a pump installed in pond with tubing from the pump going through the wall somehow and up to the rear of Sheer Falls. The water then cascades back in the pond. If customer wants to provide a drawing, we could be more specific. But not all concrete blocks are the same. He would have to be able to improvise in the real world to mount in blocks. Most likely, he would have to do some cutting of the blocks to make it work.

Reviews


Get updates about specials, announcements, and seasonal sales